The buildings are 60% to 90% completed offsite in a factory-controlled surroundings, and transported and constructed in the final construction website. This can comprise the whole construction or be parts or subassemblies of larger structures. Oftentimes, modular builders operate with traditional general contractors to exploit the resources and benefits of each type of construction. Finished modules are hauled to the construction site and constructed by means of a crane. Positioning of the modules can take from several hours to several days.

Modular buildings and modular houses are prefabricated buildings or houses that consist of recurrent sections called modules. "Modular" is a construction method that involves constructing sections away from the building site, then delivering them to the intended site. Installation of the prefabricated sections is finished on site. Prefabricated sections are occasionally placed utilizing a crane. The modules can be placed side-by-side, finishing, or piled, allowing a variety of styles and configurations.

Modular buildings, also referred to as prefabricated houses or precision built homes, are developed to equal or higher standards as onsite stick-built homes. The building way is known as permanent modular construction.

Building is offsite, using lean manufacturing methods to prefabricate solitary or multi-story buildings in deliverable module sections. Permanent Modular Construction (PMC) buildings are manufactured in a controlled environment and can be constructed of wood, steel, or concrete. Modular components are generally constructed inside on assembly lines. Modules' structure may take as few as ten days but more often one to three weeks.

The entire procedure of modular construction puts significance on the plan stage. This is really where practices such as Design for Manufacture and Assembly (DfMA) are used to ensure that assembly tolerances are regulated throughout fabrication and assembly on site. It is vital that there is enough allowance at the layout to enable the meeting to take up any"idle" or misalignment of elements. This is quite unlike onsite construction in which the tradesman can frequently create the part to suit any particular installation.

Material for stick built and modular houses are the same. Modular homes aren't doublewides or mobile homes. To begin with, modular houses don't have axles or a metal framework, meaning they are typically transported on flat-bed trucks. Modular buildings have to conform to all relevant regional building codes, while doublewides and mobile homes have metal beneath framing. Doublewides and mobile houses made in the USA are required to conform to national codes governed by U.S. Department of Housing and Urban Development.

Modular buildings may be used for long-term, temporary or permanent facilities, such as building crews, universities and schools, military and civilian housing, and industrial centers. Modular buildings are employed in rural and remote areas where conventional construction may not be reasonable or possible, by way of instance, the Halley VI lodging pods used for a BAS Antarctic expedition. [2] Other applications have included churches, healthcare facilities, retail and sales offices, fast food restaurants and cruise boat construction. They can also be used in areas that have weather issues, such as hurricanes.

Permanent modular buildings are built to meet or exceed the exact same construction standards and codes as site-built structures and also the same architect-specified substances utilized in conventionally constructed buildings are employed in modular building projects. PMC may have as many stories as construction codes allow. Unlike relocatable buildings, PMC structures are meant to stay in 1 place for the duration of their useful life.