The full procedure of modular building places significance on the design stage. This is really where practices such as Design for Manufacture and Assembly (DfMA) are used to make certain that assembly tolerances are controlled throughout fabrication and assembly on site. It's vital that there is sufficient allowance at the layout to enable the assembly to take any"idle" or misalignment of components. This is quite unlike on-site construction where the tradesman can often make the part to match any specific installation.

Modular buildings might be used for long-term, temporary or permanent facilities, including building crews, schools and classrooms, civilian and military housing, and industrial centers. Modular buildings are employed in remote and rural regions where conventional construction might not be reasonable or possible, for instance, the Halley VI accommodation pods used for a BAS Antarctic trip. [2] Other uses have included churches, health care centers, retail and sales offices, fast food restaurants and cruise ship construction. They may also be utilised in areas that have weather issues, such as hurricanes.

Building is offsite, with lean production methods to prefabricate single or multi-story buildings in deliverable module sections. Permanent Modular Construction (PMC) buildings are manufactured in a controlled environment and can be constructed of timber, steel, or concrete. Modular components are generally constructed indoors on assembly lines. Modules' construction may take as few as ten times but more often one to three weeks. PMC modules can be integrated into website constructed projects or stand alone and may be delivered with MEP, fixtures and interior finishes.

Modular buildings, also called prefabricated homes or precision built houses, are built to equivalent or higher standards as onsite stick-built houses. The building way is known as permanent modular structure.

Modular buildings and modular houses are prefabricated buildings or houses that contain repeated sections called modules. "Modular" is a construction method that involves assembling sections from the building site, then sending them to the intended site. Installation of the prefabricated sections is finished on site. Prefabricated sections are sometimes placed using a crane. The modules can be set side-by-side, end-to-end, or piled, allowing a variety of styles and configurations.

Material for stick built and modular homes are the same. Modular homes are not doublewides or mobile homes. To begin with, modular homes do not have axles or a metallic frame, meaning that they are typically transported on flat-bed trucks. Modular buildings have to conform to all applicable local building codes, whereas doublewides and mobile homes have metal under framing. Doublewides and mobile houses made in the United States are required to conform to federal codes governed by U.S. Department of Housing and Urban Development.

Permanent modular buildings are built to meet or exceed the same building standards and codes as site-built structures and also the exact same architect-specified materials utilized in conventionally built buildings are used in modular construction projects. PMC can have as many tales as building codes allow. Unlike relocatable buildings, PMC structures are meant to stay in 1 location for the duration of their useful life.

The buildings are 60% to 90% finished offsite in a factory-controlled environment, and transported and constructed in the final building site. This can comprise the whole construction or be components or subassemblies of bigger structures. In many cases, modular builders operate with conventional general contractors to exploit the tools and benefits of each type of construction. Completed modules are transported to the construction site and assembled by means of a crane. Positioning of the modules can take from a few hours to several days.